Top Navigation

Custom Categories Archives: Commercial

Advanced Cabling Systems, Inc.

Location: North Little Rock, Arkansas
Completion Date:
December 2007
Architect: RPPY Architects

In 2008, East Harding built the new headquarters for the design/installation company of voice, data, fiber optic and network cabling.  A metal building with a brick facade in North Little Rock in the new business corridor; included 5,000 sf office and conference space and 7,000 sf warehouse facility.

Business has been booming for the ‘building integration technology company’ and new space was needed in 2013.  East Harding constructed another 6,100 sf metal building; which included a theatre- style projection room for client presentations and new office space.

 


Continue Reading

First Arkansas Bank and Trust

Location: Sherwood, AR
Completion Date:
2011
Architect: WD&D Architects

FAB&T opened its new branch and mortgage center in Sherwood in February 2011.  The two-story, 10,427 sf facility features a number of ‘green’ sustainable features:

  • Lots of windows for natural lighting
  • Roof elements designed to minimize heat island effect and heat gain
  • “Cool Roof” to keep the building cooler and resist heat collection
  • Carpet tiles made from recycled backing and fibers
  • High-efficiency lighting and occupancy controls
  • Millwork utilized eucalyptus wood — has a fast growth rate and is a great renewable wood
Continue Reading

Honda of Jonesboro (Riverside Motors)

Location: Jonesboro, AR
Completion Date:  
September 2013
Architect: TAGGART Architects Inc.

Honda of Jonesboro broke ground in February for their new Honda Dealership in Jonesboro.  The project includes demolishing 5,400 sf of the existing 15,000 sf building and adding 11,492 sf of new space to create a new 21,092 sf dealership.  New showrooms, new service bays, administrative offices, a conference room and a new 2,022 sf wash bay building are all part of the Honda Center. 

Continue Reading

SWN CNG Fueling Station

Location: Conway, ARDSC_0026
Completion Date:
2013
Completed on schedule and on time was the Southwestern Energy (SWN) Compressed Natural Gas (CNG) Fueling Station in Conway, Arkansas. The CNG Station dispenses compressed natural gas. It has four dispensers and an equipment enclosed open air structure.

 

Continue Reading

Airetech Corporation

Completion Date: 2005
Location: North Little Rock, Arkansas
Architect: Cromwell Architects Engineers

Owner Representative and General Contractor for construction of new Varco Pruden Metal Building. Total 18, 532 sf. Included Tecrete access floor for underfloor air distribution, energy efficient and individualized air flow to employee’s work space.

Continue Reading

Little Rock 12th Street Station

Completion Date: 2014
Location: Little Rock, AR
Architect: 
Roark Perkins Perry Yelvington

 

The 48,000 sf, 2-story, multi-purpose facility will house the LRPD major crimes and patrol divisions, a public atrium and a public-accessible area to be leased or utilized for commercial or retail functions not affiliated with the Police Department.  This project is another anchor in the revitalization of the 12th Street Corridor.  Recent EHC projects in the corridor include the Catholic Diocese House of Formation, the CALS Children’s Library and Learning Center, and the BCD Empowerment Center.
Continue Reading