Pine Bluff Main Library

Pine Bluff Main Library

Pine Bluff Main Library

Getting Landscaped

A variety of shrubs and trees along with fresh sod are being placed to accent this beautiful new library located in downtown Pine Bluff.  Flower beds will line the walkways welcoming eager minds into a new and exciting world of learning.

The ARTSpace on Main & ARTWorks

The ARTSpace on Main & ARTWorks

The ARTSpace on Main & ARTWorks 

We are so excited to see sheetrock on the walls and a new staircase leading to the upper level soon to be filled with art, history and learning opportunities.

Team Safety Meeting | September 2020

Team Safety Meeting | September 2020

TEAM SAFETY MEETING | SEPTEMBER 2020

This month’s Team Safety Meeting focused on Fall Protection…

It is national Stand Down for Safety week and East Harding, as always, puts SAFETY as our #1 priority.

Did you know that every 1 out of 3 construction fatalities is due to a fall. Additionally, 1/3 of all fall accidents occur from ladders.

In our meeting, experts on safety such as Keith Broadway, Health & Safety Director & Nathan Kerr, Field Operations Manager offered compelling facts and protocols to keep our team, our subs and our clients safe as well as the general public.

Fall Protection not only safeguards against direct falls but also extends to falling equipment and material. That is why it is so important to be adamant about safety every day on every job site.

East Harding has an eight year record of no time lost due to jobsite accidents! 

 

Way to go Team!
SEARK College | Demolition of General Studies Buildings

SEARK College | Demolition of General Studies Buildings

SEARK College

General Studies

We are so excited to be a part of the improvements at SEARK College!

 

Steve Bloomberg, President-SEARK College (left) & Win Trafford, Business Development & Client Relations-East Harding Construction (right), visited the demolition site where the General Studies North & South buildings were torn down and cleared.