Stone Bank | Little Rock

Stone Bank | Little Rock

The renovation of Stone Bank in Little Rock is well underway. The front entrance is being transformed into a two story glass vestibule with a balcony. Interior space is being reapprpriated to include corporate offices and restrooms are being redesigned with an elegant, yet modern tile. Can’t wait to see what’s next!

Bank OZK Cantrell Branch

Bank OZK Cantrell Branch

East Harding and Polk Stanley Wilcox teamed up to build a second brand new Bank OZK branch in Little Rock. This branch is located on Cantrell Road and will have all the amenities of a modern bank branch, including two drive thru lanes and an ATM lane. Drainage systems and culverts are now in place and the site is being prepared for the foundation.

Bank OZK Chenal Branch

Bank OZK Chenal Branch

East Harding Construction is so excited to team up with Polk Stanley Wilcox Architects to build the brand new Bank OZK branch on Chenal in West Little Rock. Located across from Costco. This modern branch will total 4,480 sf and will have a three lane drive thru (2 teller windows & 1 atm lane), cashier windows, multiple offices, a breakroom and of course, a state of the art safe.

Allegiant Medplex

Allegiant Medplex

This modern medical facility, located in Monticello, is almost ready for patients! With elegantly muted colors, patients will enjoy a peaceful, calming atmosphere.
 
The exam rooms provide up to date equipment and comfortable exam tables while the breakroom gives the doctors and staff a much needed place to relax and unwind.
 
So excited to see this project nearing completion!
 
 
Great Job Team!
Pine Bluff High School | New High School

Pine Bluff High School | New High School

“This groundbreaking ceremony not only symbolized the physical construction of a new building,” said Superintendent Dr. Jennifer Barbaree, “But it represents limitless possibilities that lie ahead for our students. It is a testament to our unwavering belief in the power of education and our commitment to providing our students with the best opportunities to succeed.”
 

 

Listening to Dr. Barbaree, Mayor Shirley Washington and other Pine Bluff High School alumni speak so passionately about the new Pine Bluff High School has made me proud to know that East Harding Construction will be managing the project from start to finish with the highest level of dedication, commitment and care. Such an important project deserves only the best!
1st Photo (left to right):
Gold shovels in hand, Clayton Vaden, Lewis Architects Engineers; Shawn Carroll, Partner, Sr. VP-Operations, East Harding Construction; Van Tilbury, Partner, President & CEO, East Harding Construction; Dr. Jennifer Barbaree, Superintendent, Pine Bluff School District; Dr. Sederick Rice, President, Pine Bluff School Board, along with other school board members broke ground at Pine Bluff High School commemorating the beginning of a new era of education and a new state of the art educational facility.