The New Pine Bluff Highschool has made a lot of progress this month!
 
The steel at the Cafeteria building is complete and steel is now being installed in the Auditorium. Stud framing inside the CTE and Main Classroom buildings is underway and trusses have been started on the Main Classroom. The Arena roof is complete and CMU walls are going up. The TEAM is doing a GREAT job!
 
Southern Bancorp | Hamburg

Southern Bancorp | Hamburg

Southern Bancorp | Hamburg

Southern Bankcorp Hamburg turned out great! This neighborhood bank, located at 305 North Main Street in Hamburg, creates a convenient banking option for patrons with an easy access drive thru and ATM right in the center of town. This branch offers all of the modern amenities of a big city bank without the big city.
 
Great Job Team!
St. Joseph’s Orphanage

St. Joseph’s Orphanage

St. Joseph’s Orphanage

East Harding Construction is honored to help the Catholic Diocese of Little Rock preserve some key elements of the 115-year old St. Joseph’s Orphanage in North Little Rock, including historic statues and the main limestone signage from the front facade. Following a fire earlier this year, the statue of St. Joseph was carefully extricated and temporarily resides at the Diocese. The main limestone entry sign and two decorative capitals were salvaged and crated for storage, possibly for reuse in a future project. The main sign at 40-inches tall, 14-inches thick, 16-feet long and weighing approximately 9,000 pounds is a testament to the heritage of the center that has served the community for over a century.
Southern Bancorp | Hamburg

Southern Bancorp | Hamburg

Southern Bancorp | Hamburg

Southern Bancorp | Hamburg is looking GREAT! Sidewalks and curbs have been poured and the prep work for the drive-thru and parking area is complete. Interior framing and glass has been placed and flooring is being installed. Can’t wait to see how it turns out!