Pavilion in the Park wins Project of the Year!

Pavilion in the Park wins Project of the Year!

Pavilion in the Park wins Project of the Year!

The story of Pavilion in the Park is a strong example of resilience in commercial real estate.
.
Originally built in 1985, the Pavilion has long stood out in Little Rock for its distinctive design: an interior “street” anchored by a large glass-covered atrium and surrounded by multiple buildings. That design, while visually striking, made the damage from the March 31, 2023, EF3 tornado especially severe—particularly to the 16,000-square-foot glass atrium.
Instead of abandoning or demolishing the property, the ownership group, Flake & Company, committed to a full-scale restoration. The result was a $14M+ multi-year redevelopment that balanced major reconstruction with ongoing operations—no small feat for a multi-tenant property.
.
Continuous operations during construction meant buildings were re-roofed and reframed in phases, so tenants could remain open—an unusually complex logistical achievement. Full replacement of the damaged atrium glass and many windows, along with new HVAC systems and upgraded electrical and lighting, were all part of restoring this beautiful property. Renovated public spaces, restrooms, and tenant interiors were among the finishing touches that helped retain the Pavilion’s unique character.
.
The project team—including Polk Stanley Wilcox (architect), Metro Disaster Services, and East Harding Construction (construction manager)—delivered a renovation that didn’t just repair storm damage but stands as a clear example of how disaster recovery can make a great property even better and stronger.
.
The project was honored as “Project of the Year” at the eighth annual Commercial Real Estate Awards for its successful delivery under challenging conditions—keeping the center operational throughout construction while maintaining high standards of safety and quality. East Harding is proud and grateful to have been a part of this amazing project!
UA-Pine Bluff 2026 Spring Career Summit

UA-Pine Bluff 2026 Spring Career Summit

UA-Pine Bluff 2026 Spring Career Summit

East Harding Construction is proud and honored to have participated in the UA-Pine Bluff 2026 Spring Career Summit on Wednesday, March 4. Every UAPB student was impressive; prepared, confident, engaging, and dressed for success with resumes ready. 

East Harding Construction has a strong, ongoing partnership with UA-Pine Bluff, frequently participating in career summits and hiring interns and graduates for positions in the construction industry. East Harding is actively involved in shaping the future of the construction industry by recruiting UAPB students, with roles focusing on project and site management.

Dashaun Hammond, a 2019 UAPB graduate, transitioned from a student to an intern to a Site Superintendent at East Harding Construction and is now one of the site superintendents at the New Pine Bluff High School Campus.

Thank you, UAPB, for preparing your students for career success and for allowing us this great opportunity!

Pine Bluff High School | February 2026

Pine Bluff High School | February 2026

Pine Bluff High School | February 2026

Construction at the new Pine Bluff High School campus is advancing swiftly, marking significant milestones in the development of key facilities.

Specific facilities updates:

– Arena and Auditorium:

The exterior of both the arena and auditorium is taking shape with the installation of metal panels nearing completion. Inside the arena, the concrete slab has been poured, establishing a solid foundation for further interior work. Interior framing is ongoing.
.
– Parking and Exterior Site Work
Outside the main buildings, substantial progress has been made on the parking facilities. The east parking lot is now fully paved, improving accessibility and convenience for future students and staff. Work is actively ongoing on the west parking lot and other surrounding site areas, ensuring that the campus infrastructure supports the increased traffic and activity anticipated.
.
– Cafeteria and CTE Building Updates
The cafeteria has reached a significant stage with storefront windows installed, effectively enclosing the space and protecting it from the elements. This milestone brings the cafeteria closer to becoming a welcoming area for students. Meanwhile, the CTE building is undergoing installation of acoustical ceiling tiles, which will enhance sound quality and overall comfort within the space designed to foster technical and career-oriented education.
.
As construction continues to progress, we eagerly anticipate sharing more videos and updates that showcase the transformation of the Pine Bluff High School campus. Stay connected to follow these exciting developments as the project moves closer to completion.