Pine Bluff High School has made a ton of progress! The cafeteria steel is completely erected, the roof has bee installed on the CTE building, exterior walls are going up on the auditorium, the safe room roof has been poured, more bar joists have been placed and some of the decks for the 2nd floor of the main classroom building have been poured.
.
Amazing Job Team!